|
Asia/Pacific
Rim
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

Poulsbo, Washington
|
|
| How
to Load a Spring Carrier |
|
|
Step
1
Hold the Spring Carrier in one hand so that you can see
the tail of the spring on top, next to the plastic end
which you are about to remove. |
|
Step
2
Next, place the wrench under the spring and hook the single
tooth of the wrench onto the tail end of the spring. Let
the curve of the spring nest into the curve of the wrench. |
|
|
Step
3
Grip the Spring Carrier in one hand and push down while
the wrench is still engaged. With your other hand, open
the plastic end by turning it toward you. Insert the transmitter
metal end first. |
|
Step
4
Simply screw the plastic end back on the carrier.
Note: for the SC-1.7 model, put a 1/4" shaft screwdriver
in the hole in the plastic end to turn it. |
|
|